About
Domain Excellence

40 years of experience

About
About
Construction

Growth and progress

About
About
Execution

Effective implementation

About
About
Cost-Effective

Optimizes equipment

Projects Completed

+

80+ Innovative buildings are showcased through finished major projects.

Years of Experience

44 years of experience coming up with new ways to build things.

Projects Ongoing

Currently managing 14 EPC and 3 HAM ongoing projects.

Delivered in States

Our reach extends across 8 states.

Our Journey

Ongoing Projects

Six-Laning Dehradun Ganeshpur Highway
Hyderabad 6 lane expressway
Poanta Sahib Highway
Ambala Ring Road
Bhatinda – Ludhiana Highway

Six-Laning Dehradun Ganeshpur Highway

Location: Uttarakhand

Features: One of the longest elevated wildlife corridors in India, designed to enable free and safe movement of animals beneath the flyover. (Source: CRISIL Report)

Hyderabad 6 lane expressway

Location: Telangana

Features: Six-laning of Pune-Hyderabad section of NH-65 from km 493+000 to 524+000 from Sangareddy X roads to Madinaguda (excluding BHEL flyover from km 520+000 to 521+650).

Poanta Sahib Highway

Poanta Saheb Highway

Location: Punjab

Features: Upgradation and 4 laning of Poanta Saheb Ballupur section of NH 72 in the State of Himachal Pradesh and Uttarakhand under NH-O on HAM Pkg1 Poanta Saheb Mednipur from design Ch 0.000 to Ch 18.7000.

Ambala Ring Road

Location: Haryana

Features: Construction of 6 lane Greenfield Ambala Ring Road from junction with Shamli-Ambala section of NH-344GM near Village Kapuri and termination at Ismailabad – Ambala Section NH-152 near village Bhari under BMP in the State of Haryana (Total Length 22.524 Kms).

Bhatinda – Ludhiana Highway

Location: Punjab

Features: Development of 6-Lane access controlled Ludhiana-Bathinda greenfield highway section of NH-754Ad from Junction with Amritsar-Bathinda greenfield road (NH-754A) near Rampura Phul to junction with Moga-Barnala road (NH-703) near village Tallewal as a part of Ludhiana-Ajmer Economic Corridor in the State of Punjab.

Board Of Directors

Ram Kumar Goyal

Chairman and Managing Director

Naresh Kumar

Joint Managing Director

Krishan Kumar Goyal

Joint Managing Director

Vipin Verma

Independent Director

Arindam Pramanik

Independent Director

Barkha Gupta

Independent Director

Our Journey

Completed Projects

Sahabad Road Over Bridge
Bhatinda Rail Over Bridge
Improvement of T- Junction
Sonepat Bawana Urban Extension Road
U-Turn Flyover
Haridwar Elevated Flyover
Ludhiana Road Over Bridge cum Road Under Bridge

Sahabad Road Over Bridge

Year of Completion: 2016

Location: Haryana

Features: Construction of two-lane ROB at LC No 98 Spl on Ambala Delhi railway line crossing Shahbad Thol Road. This project primarily required construction of a “two lane ROB” within an area of 150 meters distance.

Bhatinda Rail Over Bridge

Year of Completion: 2016

Location: Punjab

Features: Construction of 4-lane ROB at LC no. SPL-1/299/14-15 at Bhatinda at RD 287.95 of NH-15 crossing Delhi-Bhatinda Railway line in the State of Punjab on EPC mode. Spanning approximately one kilometer in length, Bhatinda rail over bridge’s alignment runs parallel to a lake.

Improvement of T- Junction

Year of Completion: 2020

Location: Delhi

Features: Improvement of T Junction near Dhaula Kuan metro station including widening of national highway form Dhaula Kuna to end of Junction on NH-8 and improvement of T Junction.

Sonepat Bawana Urban Extension Road

Year of Completion: 2024

Location: Haryana

Feature: Construction of 4 lane NH-344P – package 4 (From km. 0+000 to km 29+600, 29.6 kms), starting from Bawana industrial area, Delhi (at km. 7+750 of NH-344M) till Sonipat bypass of NH-352A at village Barwasani, Sonipat in Haryana as spur of NH-344M. including a bridge constructed parallel to an existing canal.

U-Turn Flyover

Year of Completion: 2021

Location: Haryana

Features: Construction of Grade Separated 4 lane U Turn on NH-8 near Ambience Mall at Km. 24.00 and Grade Separated 3 lane U Turn near DLF Phase 2 at Km 26.120 in Gurugram in the state of Haryana.

Haridwar Elevated Flyover

Year of Completion: 2021

Location: Uttarakhand

Features: Construction of an elevated structure between Km. 199.900 to Km 201.700 including major Bridge on Mayapuri escape channel at km 201.450 in Haridwar on Muzaffarnagar-Haridwar Section of NH-58 in the state of Uttarakhand on EPC mode.

Ludhiana Road Over Bridge cum Road Under Bridge

Year: 2022

Location: Punjab

Features: Involving installation of a 72-metre span bow string girder, designed to carry four to six-lanes of traffic. Box pushing technique was used under live railway tracks.