Domain Excellence
40 years of experience
(Source: CRISIL Report) We have been assigned Class I (Super) for buildings and roads category by the Director General, Central Public Works Department, which allows us to bid for projects with a tender limit of ₹ 6,500.00 million.
40 years of experience
Growth and progress
Effective implementation
Optimizes equipment
Our Promoter, Mr. Ram Kumar Goyal, laid the foundation of our construction business in early 1980s by establishing a sole proprietorship firm. As the scope and scale of operations expanded, our Promoters, namely, Ram Kumar Goyal and Naresh Kumar constituted a partnership firm to carry out its operations. In 1998, our Promoters established a partnership firm pursuant to a partnership deed dated April 1, 1998, which marked the beginning of our operations. In early 1999s, we received a project for constructing a single layer brick lining of barsole feeder from RD 5000 to 10000 and earth work excavation and cement concrete lining 1:3:6 for raising of Fatehabad Branch from RD 184750 – 226000, which marked our early efforts in structural construction. Subsequently, we started focusing on construction of bridges and in Fiscal 2003, we completed our first road over bridge project that included earth work and retaining wall along road and other allied works in connection with Chandigarh-Ludhiana New B.G. rail link in Chandigarh. Through the partnership firms, our Promoters diversified their technical capabilities in executing various types of projects over a period of time with a focus on irrigation infrastructure and construction sectors covering construction of canal systems, drainage systems, brick canals and concrete canals. By Fiscal 2012, we enhanced our focus on structural works, positioning ourselves to undertake complex and large-scale infrastructure projects across various segments.
We have a track record of executing projects within a stipulated time, thereby ensuring no liquidated damage.
We have been able to achieve such a track record with our continuous efforts to optimize the use of resources and up-to-date technology with the help of an integrated in-house team of engineers and various professionals.
80+ Innovative buildings are showcased through finished major projects.
44 years of experience coming up with new ways to build things.
Currently managing 14 EPC and 3 HAM ongoing projects.
Our reach extends across 8 states.
Ongoing Projects
Location: Uttarakhand
Features: One of the longest elevated wildlife corridors in India, designed to enable free and safe movement of animals beneath the flyover. (Source: CRISIL Report)

Location: Telangana
Features: Six-laning of Pune-Hyderabad section of NH-65 from km 493+000 to 524+000 from Sangareddy X roads to Madinaguda (excluding BHEL flyover from km 520+000 to 521+650).

Poanta Saheb Highway
Location: Punjab
Features: Upgradation and 4 laning of Poanta Saheb Ballupur section of NH 72 in the State of Himachal Pradesh and Uttarakhand under NH-O on HAM Pkg1 Poanta Saheb Mednipur from design Ch 0.000 to Ch 18.7000.

Location: Haryana
Features: Construction of 6 lane Greenfield Ambala Ring Road from junction with Shamli-Ambala section of NH-344GM near Village Kapuri and termination at Ismailabad – Ambala Section NH-152 near village Bhari under BMP in the State of Haryana (Total Length 22.524 Kms).

Location: Punjab
Features: Development of 6-Lane access controlled Ludhiana-Bathinda greenfield highway section of NH-754Ad from Junction with Amritsar-Bathinda greenfield road (NH-754A) near Rampura Phul to junction with Moga-Barnala road (NH-703) near village Tallewal as a part of Ludhiana-Ajmer Economic Corridor in the State of Punjab.

Founded in 1980
Chairman and Managing Director
Chairman and Managing Director
Joint Managing Director
Joint Managing Director
Joint Managing Director
Joint Managing Director
Independent Director
Independent Director
Independent Director
Completed Projects
Year of Completion: 2016
Location: Haryana
Features: Construction of two-lane ROB at LC No 98 Spl on Ambala Delhi railway line crossing Shahbad Thol Road. This project primarily required construction of a “two lane ROB” within an area of 150 meters distance.

Year of Completion: 2016
Location: Punjab
Features: Construction of 4-lane ROB at LC no. SPL-1/299/14-15 at Bhatinda at RD 287.95 of NH-15 crossing Delhi-Bhatinda Railway line in the State of Punjab on EPC mode. Spanning approximately one kilometer in length, Bhatinda rail over bridge’s alignment runs parallel to a lake.

Year of Completion: 2020
Location: Delhi
Features: Improvement of T Junction near Dhaula Kuan metro station including widening of national highway form Dhaula Kuna to end of Junction on NH-8 and improvement of T Junction.

Year of Completion: 2024
Location: Haryana
Feature: Construction of 4 lane NH-344P – package 4 (From km. 0+000 to km 29+600, 29.6 kms), starting from Bawana industrial area, Delhi (at km. 7+750 of NH-344M) till Sonipat bypass of NH-352A at village Barwasani, Sonipat in Haryana as spur of NH-344M. including a bridge constructed parallel to an existing canal.

Year of Completion: 2021
Location: Haryana
Features: Construction of Grade Separated 4 lane U Turn on NH-8 near Ambience Mall at Km. 24.00 and Grade Separated 3 lane U Turn near DLF Phase 2 at Km 26.120 in Gurugram in the state of Haryana.

Year of Completion: 2021
Location: Uttarakhand
Features: Construction of an elevated structure between Km. 199.900 to Km 201.700 including major Bridge on Mayapuri escape channel at km 201.450 in Haridwar on Muzaffarnagar-Haridwar Section of NH-58 in the state of Uttarakhand on EPC mode.

Year: 2022
Location: Punjab
Features: Involving installation of a 72-metre span bow string girder, designed to carry four to six-lanes of traffic. Box pushing technique was used under live railway tracks.