Year of Completion: 2016
Location: Haryana
Features: Construction of two-lane ROB at LC No 98 Spl on Ambala Delhi railway line crossing Shahbad Thol Road. This project primarily required construction of a “two lane ROB” within an area of 150 meters distance.

Year of Completion: 2016
Location: Punjab
Features: Construction of 4-lane ROB at LC no. SPL-1/299/14-15 at Bhatinda at RD 287.95 of NH-15 crossing Delhi-Bhatinda Railway line in the State of Punjab on EPC mode. Spanning approximately one kilometer in length, Bhatinda rail over bridge’s alignment runs parallel to a lake.

Year of Completion: 2020
Location: Delhi
Features: Improvement of T Junction near Dhaula Kuan metro station including widening of national highway form Dhaula Kuna to end of Junction on NH-8 and improvement of T Junction.

Year of Completion: 2024
Location: Haryana
Feature: Construction of 4 lane NH-344P – package 4 (From km. 0+000 to km 29+600, 29.6 kms), starting from Bawana industrial area, Delhi (at km. 7+750 of NH-344M) till Sonipat bypass of NH-352A at village Barwasani, Sonipat in Haryana as spur of NH-344M. including a bridge constructed parallel to an existing canal.

Year of Completion: 2021
Location: Haryana
Features: Construction of Grade Separated 4 lane U Turn on NH-8 near Ambience Mall at Km. 24.00 and Grade Separated 3 lane U Turn near DLF Phase 2 at Km 26.120 in Gurugram in the state of Haryana.

Year of Completion: 2021
Location: Uttarakhand
Features: Construction of an elevated structure between Km. 199.900 to Km 201.700 including major Bridge on Mayapuri escape channel at km 201.450 in Haridwar on Muzaffarnagar-Haridwar Section of NH-58 in the state of Uttarakhand on EPC mode.

Year: 2022
Location: Punjab
Features: Involving installation of a 72-metre span bow string girder, designed to carry four to six-lanes of traffic. Box pushing technique was used under live railway tracks.